A+ A A-

This project included 2 EPC packages for PEDCO and the first contract was signed on 15th Jun. 2002. These projects were defined to increase the capacity of existing facilities to 220,000 bpd from 50 wells. EPC I (11 months) included 2 wellhead jackets (2500 T) and EPC II (24 months) included 3 jackets (2660 T), 4 topsides (5195 T), FPP tower and two bridges (301 T). The EPC I was delivered in Mar. 2005 and EPC II was delivered in Sep 2009.

 

Project Summary
   Location    SALMAN  Oil & Gas Field EPC I and EPC II
   Client    PEDCO
   Duration    11 + 24 months
   Start Date    Jun. 2002
   Completion Date    Sep. 2009
  Scope 
   EPC package of:
   
  • 2SK-B Jacket (830 Tons)
  • 2SK-C Jacket (830 Tons)
  • PP3 Jacket (730 Tons)
  • PP3 Topsides (721 Tons)
  • FPP Jacket (220 Tons)
  • LQ3 Jacket (607 Tons)
  • LQ3 Topside (1.818 Tons)
  • Bridge, KPP/LQ3 (140 Tons)
  • Bridge, PP3/NPP (140 Tons)
  • FPP (Flare Tower) (83 Tons)
 salj2  salj1
 STC 5425 16 3