The EPCC contract for two Jack Up drilling units was signed between POGC and SAFF on 9th of Jul. 2007. The basic design and detailed designed for Rosemond SA-20 Jack up was done SAFF and Rosemond and this design has received Korean Register patent and it is certified by Iranian Research Organization for Science and Technology.

 

Project Summary

 

 Location  Bandar Abbas  2
 Client  Pars Oil & Gas Company
 Duration  28
 Start Date  Dec. 2007
 Scope  
EPCC Package for two super M2 jackup drilling rigs:
  •  Korean Register Patent Approval
  • Conceptual Design Technological Capability Certificate issued by Iranian Research Organization for Science and Technology

 

Main Specification
 Operating Water Depth  330ft (100.58m) Picture1
 Drilling Depth  30000 ft [9144 m]
 Length Overall  196.5 ft [59.9 m]
 Width Overall  177 ft[54 m]
 Depth of Hull  25 ft[7.6 m]
 Leg total length  441ft[134.42m]
 Leg distance (Traversal)  115ft[35 m]
 Leg distance (Longitudinal)  120.08 ft,(36.6 m)
 Spud Can Diameter

 42.26ft[14.1m]

 Maximum drill floor offset  +/- 15ft (+/- 4.8 m)
 Max variable deck load  +/- 15ft (+/- 4.6 m)

 Max. Drilling Variable Deck Load

 9,000 kips [4,083 m. tons]
 Max. Survival Deck Load  6,000 kips [2,722 m. tons]
 Max Combined Drill floor Load  2,200 kips [998 m. tons]
 Quarters Capacity  120 Persons