Salman Offshore Facilities

Completed Off shore, Off Shore, Projects

The EPC I and EPC II projects included five jackets and two topsides for PEDCO and the first contract was signed on15th J un.2002.These projects were defined to increase the capacity of existing facilities to 220,000 bpd from 50 wells. EPC I (11 months) included 2 wellhead jackets and EPC  (24 months) included 3 jackets,4 topsides, FPP tower and two bridges. The EPCl was delivered in Mar. 2005 and EPC II was delivered in Sep 2009.

Client: PEDCO