The Methanol Export Terminal of Siraf

Current Offnshore, Off Shore, Projects

The Methanol Export Terminal of Siraf as  a part of Siraf Petrochemical Plant will include onshore structures, marine pipeline, SPM and related structures in Bushehr province-Dayyer port and be implemented as and EPC project. The goal of the above-mentioned project is an ability to export one million, six hundred and fifty tons of methanol a year as an average amount via submarine pipeline and through SPM to Tanker. To make all of this happen it is necessary to consider all of needed structures, for instance pump station, metering system, pigging system, control room, industrial buildings and other auxiliary facilities at onshore section and Calm Bouy (SPM) and 6.4 KM 24” offshore pipeline.

Client:Sirafco

Projects

Menu